top of page

BLR-217

221-HSR Layout

Area / Length:

2266 m

Main access road:

24th Main Road

Nominee:

Community Task Force

Trust

Partner:

Activities:

Vending, encroachments by vendors

Issues:

Unsafe, Garbage dumping, In-accessible, Crime hotspot, Accident prone, Encroachments, No maintenance / dirty

Importance of the site

24th main road is a main commercial hub which does not have adequate parking space within their premises. Hence vehicles are parked on road on both sides. this makes it difficult for pedestrians to walk. Lack of walkable footpath is forcing people to use motorized transport and hence its chocked with vehicles and carbon emissions are high. Street occupied by food carts, permanent vendors and littering. Vehicles parked on footpath. Garbage thrown on footpath and hence its not walkable. no footpath in some sections. Lack of traffic discipline leads to traffic congestion. Hence lack of safety for pedestrians and hence all are walking on main road leading to life threat. No drainage system in many places. -clean walkable footpath drainage system median on road removal of car parking on road school zone

Proposed idea / vision:

Having big wide footpaths, having a dedicated pedestrian signal and cameras to enforce the red lights. Nice painted marked road lanes with large streetlights to illuminate the area and Clean,Safe and walkable footpath accessible to all Improved Green cover Multilevel parking facility Garbage bins Proper alignment of OFC cables (no hanging cables) Proper drainage system Removal of encroachments Barricades on footpath Relaxing spaces with chairs for socialising Sign boards Fine boards (Penalty) Cctv camera
bottom of page