top of page

BLR-232

75-Pulikeshinagar

Area / Length:

50 sqm

Main access road:

Borebank road

Nominee:

Borebank road

Partner:

Upgrading Pottery Town Metro Access

Site context

The site is a 200-metre first- and last-mile road segment connecting Benson Town to Pottery Town Metro Station.

Issues

● Footpaths are narrow, discontinuous, and encroached by waste and construction debris, forcing pedestrians onto the carriageway ● Auto-tippers are parked where footpaths should exist and are used to store waste, creating unhygienic conditions ● A breach in the railway wall due to ongoing work is used by pedestrians to cross tracks, leading to accidents

Priority Interventions

● Repair and closure railway wall breaches to prevent unsafe track crossings ● Remove all legacy waste and construction debris ● Relocate auto-tippers and waste storage to a designated facility away from this connector street ● Regularise the carriageway and develop wide, continuous, universally accessible footpaths with tree shade, bus bays, drop-off zones, and regulated parking (where permitted)

bottom of page