Priority Interventions
Repair and closure railway wall breaches to prevent unsafe track crossings.
Remove all legacy waste and construction debris.
Relocate auto-tippers and waste storage to a designated facility away from this connector street.
Regularise the carriageway and develop wide, continuous, universally accessible footpaths with tree shade, bus bays, drop-off zones, and regulated parking (where permitted).
Site context
The site is a 200-metre first- and last-mile road segment connecting Benson Town to Pottery Town Metro Station.
Issues
Footpaths are narrow, discontinuous, and encroached by waste and construction debris, forcing pedestrians onto the carriageway.
Auto-tippers are parked where footpaths should exist and are used to store waste, creating unhygienic conditions.
A breach in the railway wall due to ongoing work is used by pedestrians to cross tracks, leading to accidents.