top of page
ಬಿಬಿಎಂಪಿ_ಲೋಗೋ (2).png

ಬೆಂಗಳೂರಿನ ಸಾರ್ವಜನಿಕ ಸ್ಥಳಗಳನ್ನು ಪುನರುಜ್ಜೀವಿತಗೊಳಿಸುವುದು

BLR-284

Halasuru Lake-Edge Redevelopment

Area / Length:

2420 m

Main access road:

Annaswamy Mudaliar Road, Halasuru

Nominee

Balan and Nambisan Architects

Beary s Acacia Lakeview, Ulsoor

Budget

Priority Interventions

This project optimises accessibility around the lake through the following interventions: 

  • Relocating Gate 2  (on Annaswamy Mudaliar Rd, opposite RBANM gate) closer to the gazebo or another gate closer to Ajanta Road intersection away from narrow bottlenecks and installing bollards to prevent illegal parking. 

  • Reclaiming underutilised Rajakaluve buffer space for dedicated cycle and two-wheeler parking, while establishing a continuous, standardised footpath along the lake’s perimeter. 

  • Key maintenance measures include screening the men's toilet and banning pigeon feeding to protect the structural integrity of footpaths from rodent damage. 

Together, these steps prioritise pedestrian safety, streamline traffic, and revitalise the lake's edge for community use.

Site context

The site encompasses the entire periphery of Ulsoor Lake, including its four primary entrance points; two on the Madras Sappers (East) side and two on the Annaswamy Mudaliar Rd (West)

Issues

Aside from the main entry at the intersection of Annaswamy Mudaliar Rd, the other three do not have accessible entries or clear parking arrangements, leading to haphazard parking around the park and on the footpath. In addition, the footpath around the lake is also broken and discontinuous.

bottom of page