top of page
ಬಿಬಿಎಂಪಿ_ಲೋಗೋ (2).png

ಬೆಂಗಳೂರಿನ ಸಾರ್ವಜನಿಕ ಸ್ಥಳಗಳನ್ನು ಪುನರುಜ್ಜೀವಿತಗೊಳಿಸುವುದು

BLR-222

Vijinapura Railway Road Redevelopment

Area / Length:

-

Main access road:

Channasandra Railway station road, Kasthuri Nagar

Nominee:

NA

Budget

₹ 1 - 5 Crore

Priority Interventions

Transform this transit node into a safe, illuminated pedestrian corridor with nature-based solutions. Interventions include structured walkways and seating that turn a neglected railway edge into a dignified commuter gateway.

Site context

The site is a critical transit-adjacent edge. Positioned as a vital gateway for commuters, this green and blue infrastructure edge currently functions as a neglected boundary rather than a functional public realm.

Issues

The high-volume railway station access point lacks critical safe pedestrian infrastructure, forcing commuters into hazardous movement patterns. Simultaneously, unmanaged vegetation and poor maintenance have degraded the blue-green edge into a neglected corridor. This lack of oversight encourages illegal dumping and severely reduces visibility.

bottom of page