
ಬೆಂಗಳೂರಿನ ಸಾರ್ವಜನಿಕ ಸ್ಥಳಗಳನ್ನು ಪುನರುಜ್ಜೀವಿತಗೊಳಿಸುವುದು
East Zone 2
BLR-222
Vijinapura Railway Road Redevelopment
Area / Length:
-
Main access road:
Channasandra Railway station road, Kasthuri Nagar
Nominee:
NA
Budget
₹ 1 - 5 Crore
Priority Interventions
Transform this transit node into a safe, illuminated pedestrian corridor with nature-based solutions. Interventions include structured walkways and seating that turn a neglected railway edge into a dignified commuter gateway.
Priority Interventions
Transform this transit node into a safe, illuminated pedestrian corridor with nature-based solutions. Interventions include structured walkways and seating that turn a neglected railway edge into a dignified commuter gateway.
Site context
The site is a critical transit-adjacent edge. Positioned as a vital gateway for commuters, this green and blue infrastructure edge currently functions as a neglected boundary rather than a functional public realm.
Issues
The high-volume railway station access point lacks critical safe pedestrian infrastructure, forcing commuters into hazardous movement patterns. Simultaneously, unmanaged vegetation and poor maintenance have degraded the blue-green edge into a neglected corridor. This lack of oversight encourages illegal dumping and severely reduces visibility.

